Start With the Work, Then Choose the Machine
Explore equipment for your next project across India, Nepal, Bangladesh and Bhutan. Rent weekly, monthly or yearly, with configuration, availability and pricing confirmed against your site brief.
Excavators
Excavation, earthworks and attachments
↗Backhoe Loaders
Digging and loading in one machine
↗Cranes
Lift planning starts with the load
↗Compactors
Road and soil compaction
↗Bulldozers
Site clearing and grading
↗Forklifts
Material handling around your site
↗Horizontal Directional Drill
Trenchless installation requirements
↗Passenger Hoist
Vertical access for your workforce
↗Earthmoving and Material Movement
Compare the task, working space and material before choosing equipment. A model name alone does not establish reach, access, attachment suitability or handling capacity.
- Excavators and mini excavators: describe the excavation, depth, access and required bucket or breaker
- Backhoe and skid steer loaders: separate digging, loading and confined-space requirements
- Bulldozers and motor graders: identify clearing, earthmoving or final grading work
- Forklifts and haulage: specify the load, lift or travel requirement, surface and receiving area
Lifting, Roads and Concrete
For lifting, share load details, working radius and site access rather than requesting by nominal capacity alone. For compaction and concrete work, describe the material, area and delivery sequence.
- Cranes and access equipment: plan around the load, working position and site constraints
- Road rollers and compactors: identify the surface, material and project specification
- Concrete equipment: share pour requirements, access and the proposed delivery arrangement
- Piling, foundation, power and site-support equipment: provide the task specification and operating conditions
What's New
Horizontal Directional Drill (HDD) enquiries now have a dedicated category. Bring the bore route, installation dimensions and ground information; machine selection and scope are confirmed after review.
Passenger Hoist enquiries cover single- and double-cage configurations. Choose a total configuration capacity of 500 kg, 1 ton or 2 ton—not a per-cage rating—and enter a height from 10 m to 100 m inclusive. RIGR must approve the site-specific configuration and loading.
Build One Quote Around the Programme
Need an excavator, crane and material-handling equipment at different stages? Send one list with a line for each machine, site, quantity, start date and duration. Flag any dates that depend on another activity finishing.
Confirm the equipment and operator scope, included hours, overtime and meter reporting. Transport is separately chargeable; fuel, maintenance responsibilities, insurance scope, taxes and additional handling must be clear in the written quotation.
Check the Fleet, Confirm the Deployment
The ready-to-deploy fleet page provides a dated view of listed models and quantities. It is not a live stock reservation. If you are unsure which category fits, describe the work and let RIGR review the requirement.